Orange County · Service Area

Home Remodeling in Fullerton, CA

Legacy Construction & Design remodels kitchens, bathrooms and more in Fullerton, with a free in-home consultation to start. Fullerton has some of the older housing in north Orange County, with many homes from the early and middle twentieth century alongside later tracts and hillside houses. Older homes often have character worth keeping, such as original trim and built-ins, along with small kitchens, single bathrooms and decades of layered paint and patched plaster.

Serving
Fullerton, Orange County
Consultation
Free, in your home
Licensed
CA License #790442
Rated
BBB A+ · 5.0 on Google
Local Know-How

Remodeling a Home in Fullerton

Remodeling an older Fullerton home is usually about updating function while respecting the house. We fit new cabinetry and counters into existing kitchen layouts, rebuild bathrooms within the original footprint, and build custom cabinetry that matches the home's trim and proportions. Exterior and interior painting is common too, and for homes built before 1978, painted surfaces may need testing before any scraping or sanding. You get a written estimate before any work begins, and we tell you at the first visit if an idea would need a permit.

Older homes with character

01

Many Fullerton homes have original trim, built-ins and details worth keeping. We plan new cabinetry and finishes to suit the house rather than fight it.

Lead paint in pre-1978 homes

02

Homes built before 1978 may have lead-based paint under newer coats. Tell us your home's age so painted surfaces can be tested before any scraping or sanding.

Small kitchens and single baths

03

Older floor plans often have compact kitchens and one or two small bathrooms. Better storage, lighting and fixtures make them work harder in the same footprint.

Surprises behind the walls

04

Old galvanized pipe, past leaks and uneven framing are more common in older homes. We show you what we find after demolition and price it before any extra work.

What Our Clients Say

"The attention to details and my personal preferences were addressed with professionalism plus patience… My kitchen is gorgeous! The plumbing, painting, new cabinetry, appliances, flooring, lighting, and design are impeccable!"
Kelly S. · Google Review
"Great job from Richard Centella from Legacy Construction and Design - he and his crew did an excellent job converting two of our bathtubs into walking showers. He was present every workday making sure that things were running smoothly and on schedule. The job was completed on time and to our complete satisfaction."
Maria O. · Google Review
Homeowner Q&A

Questions We Answer Every Week

All answers

What should I know before updating an older kitchen in Fullerton?

Before updating an older Fullerton kitchen, expect walls that are out of square, limited electrical capacity and possible surprises behind the plaster. Keeping the layout avoids permit work and lets the budget go to cabinets, counters and lighting. A full remodel costs $35,000 to $75,000+, the same as our other cities.

Read the answer

Should I keep a tub if I convert to a shower?

Keep at least one tub if your home would otherwise have none and you bathe young children or expect that future buyers will want one. If another bathroom already has a tub, converting this one is usually the better choice, especially when climbing over the tub wall has become difficult or the tub sits unused.

Read the answer

Porcelain vs natural stone shower tile: which should I choose?

Porcelain is the better choice for most showers because it is dense, water resistant, low maintenance and usually costs less. Choose natural stone, such as marble or travertine, if you want the variation of a real quarried material and accept periodic sealing and gentler cleaning. Both perform well over a properly waterproofed shower.

Read the answer

Can I add heated floors to my bathroom?

Yes, if an existing GFCI-protected circuit can carry the heating mat. We install electric radiant mats under the tile, controlled by a programmable thermostat, and check the circuit before planning one. A mat that needs its own new circuit requires a permit and is outside the projects we take on.

Read the answer

What is the best bathroom vanity top material?

Quartz is the best all-around vanity top for most bathrooms because it does not need sealing and resists stains from makeup, toothpaste and hair products. Granite is a durable natural alternative with periodic sealing. Marble looks classic but etches and stains more easily, so it suits a lightly used or carefully kept bathroom.

Read the answer

How do I prevent mold in a bathroom with fans and materials?

Prevent bathroom mold by removing moisture and blocking water from reaching the framing. That means an exhaust fan vented outside and run during and after every shower, a waterproofing membrane behind the tile, and surfaces that dry quickly and clean easily. A fan with humidity control removes the need to remember the switch.

Read the answer

Fullerton Remodeling FAQ

Do you remodel older homes in Fullerton?

+
Yes, older homes are a large part of our work in Fullerton. We update kitchens, bathrooms, paint and cabinetry while keeping the details that give the house its character. Every project starts with a free in-home consultation.

My Fullerton home was built before 1978. Is lead paint a concern?

+
It can be. Homes built before 1978 may have lead-based paint under newer coats, so tell us your home's age when you request an estimate. Painted surfaces may need to be tested before any scraping or sanding, and we walk you through the options before work starts.

What if you find old pipes or water damage during demolition?

+
We stop, show you what we found and give you a price before doing any extra work. Older homes are more likely to have galvanized pipe or past leaks behind the walls. Nothing is added to the job without your approval.

Can you add a second bathroom to my house?

+
No. Adding a bathroom means new drains and plumbing, which requires a permit, and that is outside the projects we take on. We can remodel your existing bathrooms to make them more comfortable and easier to share. We keep our projects within the scope that does not require a building permit, and we tell you at the first visit if what you have in mind would need one.

Can you match new built-ins to my home's original trim?

+
Yes. We design built-in cabinetry to match the profiles, proportions and paint of your existing trim so it looks like it belongs to the house. Cabinetry usually takes 3 to 6 weeks from design approval, and most built-ins cost $3,000 to $15,000+ per unit.

How long does exterior painting take?

+
An average exterior takes about a week on site, and an average interior takes 2 to 5 days. Older homes can need more prep for cracked stucco or peeling trim, which we include in the written estimate. Choosing colors usually takes longer than the painting itself.

Start Your Fullerton Project

Tell us what you have in mind. We'll set up a free in-home consultation and give you a detailed written estimate before any work begins.

Call (844) FOR-LGCY

Mon–Fri 7:00 AM – 6:00 PM · Sat by appointment

Get a Free Fullerton Estimate

Tell us a little about your project. We respond within 24 hours.

  • CA License #790442
  • BBB Accredited A+
  • 35+ Years
  • Free In-Home Consultation

No obligation. Your information is kept confidential.