Luxury Kitchen Remodeling in Southern California
Transform your kitchen into a culinary masterpiece. Legacy Construction & Design specializes in complete kitchen renovations featuring custom cabinetry, premium stone countertops, professional-grade appliances, and thoughtful layouts that make cooking a joy.
- Typical cost
- $35,000–$75,000+
- On-site time
- 3–4 weeks
- Permit
- Not needed for the projects we take on
- Serving
- Riverside & Orange County
Kitchen Remodel Guide
By Legacy Construction & Design · CA License #790442 · Updated October 2026
A full kitchen remodel in Southern California typically costs $35,000 to $75,000+, and on-site construction usually takes 3 to 4 weeks once cabinets and materials are ready. A semi-custom package holds a project toward the lower end; full custom cabinetry, natural stone and pro-grade appliances push it toward the top of that range and beyond.
Legacy Construction & Design has remodeled kitchens across Murrieta, Temecula, Corona and Orange County for over 35 years. One team handles design, demolition, plumbing and electrical in the existing locations, cabinetry, countertops, tile and finish work, so you have one point of contact from the first measurement to the final walkthrough. This guide covers what drives the cost, how the schedule really works, what the code requires, and how to choose materials.
What We Deliver
Recent Projects






Before & After
Drag the slider to reveal the transformation.
Kitchen Transformation


Kitchen Remodel


Kitchen with Range Hood


Kitchen Remodel Cost in Southern California
Every kitchen is priced from a written estimate after a free in-home consultation. This is the typical range we see for homes in Riverside and Orange County.
Where your project lands in this range depends on your space, the scope of work and the materials you choose.
What Moves the Price
Cabinetry
Usually the largest single line item. Refacing costs a fraction of new boxes; full custom costs the most but fits the space exactly.
Keeping the layout
Keeping the sink, range and walls where they are is the biggest way to control cost, and it keeps the project within the scope that does not need a permit.
Countertop material and slab count
Quartz and granite sit in the middle; marble and large islands that need extra slabs cost more.
Appliance package
A standard package and a pro-grade range, panel-ready refrigerator and hood can differ by tens of thousands of dollars.
Appliance power needs
Pro-grade ranges, double ovens and built-in refrigeration draw more power than standard units. We confirm what your existing kitchen circuits and panel can support before the appliance package is final. An appliance that needs a new circuit requires a permit and is outside the projects we take on.
What's behind the walls
Old galvanized pipe, past leaks or water damage are only visible after demolition. We show you what we find and price it before any extra work.
Kitchen Remodel Timeline
Most of the waiting happens before demolition, while cabinets and stone are ordered. Once we start on site, a full kitchen typically takes 3 to 4 weeks.
Start with a free consultation- 01
Consultation & measure
Week 0Free in-home visit to walk the space, talk through how you cook and entertain, and set a working budget.
- 02
Design & selections
1–2 weeksLayout, 3D renderings, and selections for cabinets, countertops, tile, fixtures and lighting.
- 03
Ordering
2–6 weeksCabinet and appliance lead times vary by manufacturer. We confirm delivery dates before we schedule demolition.
- 04
Demolition & prep
On-site week 1Protection of floors and adjoining rooms, demolition, and plumbing and electrical prep at the existing locations.
- 05
Cabinets, counters & tile
On-site weeks 2–3Cabinet installation, countertop templating and installation, then backsplash tile.
- 06
Finish & walkthrough
On-site weeks 3–4Appliances, fixtures, lighting, trim and paint, final cleanup, and a walkthrough of every detail with you.
Permits & Code
In California, a kitchen remodel that adds or moves plumbing, gas lines or electrical circuits, or changes walls, needs a building permit from your city (for example Murrieta, Temecula or Corona) or from the county in unincorporated areas. Like-for-like work such as new countertops, cabinet refacing or paint often does not, but rules vary by city.
- 01
California's electrical code requires dedicated 20-amp small-appliance circuits for countertop outlets, with GFCI and AFCI protection. Adding a new circuit requires a permit and is outside the projects we take on, so we work with your existing circuits and install GFCI protection where we replace outlets.
- 02
Title 24 energy rules require new or altered kitchen lighting to be high-efficacy, which in practice means quality LED fixtures.
- 03
Removing or opening a load-bearing wall requires structural engineering and a permit, which is why our kitchens work within the existing walls.
- 04
We keep our projects within the scope that does not require a building permit, and we tell you at the first visit if what you have in mind would need one, so you can plan with no surprises.
- 05
If you live in an HOA community, check its rules on work hours, dumpsters and contractor parking before the start date.
- (844) FOR-LGCYNot sure what applies?
We tell you at the free consultation whether your project fits within the scope that needs no permit.
Materials & Options
Countertops
4 optionsQuartz
Busy family kitchens
Non-porous and low maintenance, with consistent color. Use trivets: the resin can scorch under very hot pans.
Granite
Heavy cooking, natural look
Very heat resistant, and every slab is unique. Needs periodic sealing.
Marble (e.g. Calacatta)
Statement islands, bakers
Unmatched veining and a cool surface for pastry. Softer, and acids like lemon or wine can etch it.
Porcelain slab
Modern looks, sunny rooms
Thin, heat and UV resistant, and stain proof. Edges can chip under a hard impact.
Cabinets
3 optionsRefacing
Sound boxes, tight budget
New doors, drawer fronts and veneer on existing boxes. The layout stays the same.
Semi-custom
Most full remodels
Wide choice of sizes, finishes and organizers, with moderate lead times.
Full custom
Unusual spaces, high-end design
Built to the inch in any species or finish. Longest lead time and highest cost.
"We had been looking to remodel our kitchen for a long time. And after a bad experience with a sloppy handyman, we found Legacy Construction through porch.com. Richard and his team did a great job of transforming our kitchen. Their professionalism and keen attention to details was impressive."
Kitchen Remodel FAQ
How much does a kitchen remodel cost in Southern California?
+
How long does a complete kitchen renovation take?
+
Do I need a permit for a kitchen remodel in Murrieta, Temecula or Corona?
+
Can I stay in my home during a kitchen remodel?
+
What countertop materials do you recommend?
+
Can you remove a wall to open my kitchen to the living room?
+
How much space do I need for a kitchen island?
+
Should I choose appliances before cabinets?
+
How much contingency should I budget for a kitchen remodel?
+
Do you handle the plumbing and electrical work?
+
Do you provide design help and 3D renderings?
+
Which cities do you serve for kitchen remodeling?
+
Plan the Transformation
Every exceptional space begins with a conversation. Share your vision with us — we'll bring three decades of mastery to make it real.