Kitchen Remodels
Kitchen Remodels

Luxury Kitchen Remodeling in Southern California

Transform your kitchen into a culinary masterpiece. Legacy Construction & Design specializes in complete kitchen renovations featuring custom cabinetry, premium stone countertops, professional-grade appliances, and thoughtful layouts that make cooking a joy.

Typical cost
$35,000–$75,000+
On-site time
3–4 weeks
Permit
Not needed for the projects we take on
Serving
Riverside & Orange County

Kitchen Remodel Guide

By Legacy Construction & Design · CA License #790442 · Updated October 2026

A full kitchen remodel in Southern California typically costs $35,000 to $75,000+, and on-site construction usually takes 3 to 4 weeks once cabinets and materials are ready. A semi-custom package holds a project toward the lower end; full custom cabinetry, natural stone and pro-grade appliances push it toward the top of that range and beyond.

Legacy Construction & Design has remodeled kitchens across Murrieta, Temecula, Corona and Orange County for over 35 years. One team handles design, demolition, plumbing and electrical in the existing locations, cabinetry, countertops, tile and finish work, so you have one point of contact from the first measurement to the final walkthrough. This guide covers what drives the cost, how the schedule really works, what the code requires, and how to choose materials.

What We Deliver

Custom cabinetry with premium hardware
Calacatta marble & quartz countertops
Professional-grade appliance installation
Custom tile backsplash designs
Hardwood & luxury vinyl flooring
Recessed & pendant lighting design
Kitchen island & breakfast bar builds
Complete plumbing & electrical upgrades

Recent Projects

Kitchen Remodels project 1
Kitchen Remodels project 2
Kitchen Remodels project 3
Kitchen Remodels project 4
Kitchen Remodels project 5
Kitchen Remodels project 6

Before & After

Drag the slider to reveal the transformation.

Kitchen Transformation

Kitchen Transformation - afterKitchen Transformation - before
Before
After

Kitchen Remodel

Kitchen Remodel - afterKitchen Remodel - before
Before
After

Kitchen with Range Hood

Kitchen with Range Hood - afterKitchen with Range Hood - before
Before
After
Investment

Kitchen Remodel Cost in Southern California

Every kitchen is priced from a written estimate after a free in-home consultation. This is the typical range we see for homes in Riverside and Orange County.

Typical cost
$35,000–$75,000+

Where your project lands in this range depends on your space, the scope of work and the materials you choose.

What Moves the Price

01

Cabinetry

Usually the largest single line item. Refacing costs a fraction of new boxes; full custom costs the most but fits the space exactly.

02

Keeping the layout

Keeping the sink, range and walls where they are is the biggest way to control cost, and it keeps the project within the scope that does not need a permit.

03

Countertop material and slab count

Quartz and granite sit in the middle; marble and large islands that need extra slabs cost more.

04

Appliance package

A standard package and a pro-grade range, panel-ready refrigerator and hood can differ by tens of thousands of dollars.

05

Appliance power needs

Pro-grade ranges, double ovens and built-in refrigeration draw more power than standard units. We confirm what your existing kitchen circuits and panel can support before the appliance package is final. An appliance that needs a new circuit requires a permit and is outside the projects we take on.

06

What's behind the walls

Old galvanized pipe, past leaks or water damage are only visible after demolition. We show you what we find and price it before any extra work.

How it unfolds

Kitchen Remodel Timeline

Most of the waiting happens before demolition, while cabinets and stone are ordered. Once we start on site, a full kitchen typically takes 3 to 4 weeks.

  1. 01

    Consultation & measure

    Week 0

    Free in-home visit to walk the space, talk through how you cook and entertain, and set a working budget.

  2. 02

    Design & selections

    1–2 weeks

    Layout, 3D renderings, and selections for cabinets, countertops, tile, fixtures and lighting.

  3. 03

    Ordering

    2–6 weeks

    Cabinet and appliance lead times vary by manufacturer. We confirm delivery dates before we schedule demolition.

  4. 04

    Demolition & prep

    On-site week 1

    Protection of floors and adjoining rooms, demolition, and plumbing and electrical prep at the existing locations.

  5. 05

    Cabinets, counters & tile

    On-site weeks 2–3

    Cabinet installation, countertop templating and installation, then backsplash tile.

  6. 06

    Finish & walkthrough

    On-site weeks 3–4

    Appliances, fixtures, lighting, trim and paint, final cleanup, and a walkthrough of every detail with you.

Good to know

Permits & Code

In California, a kitchen remodel that adds or moves plumbing, gas lines or electrical circuits, or changes walls, needs a building permit from your city (for example Murrieta, Temecula or Corona) or from the county in unincorporated areas. Like-for-like work such as new countertops, cabinet refacing or paint often does not, but rules vary by city.

  • 01

    California's electrical code requires dedicated 20-amp small-appliance circuits for countertop outlets, with GFCI and AFCI protection. Adding a new circuit requires a permit and is outside the projects we take on, so we work with your existing circuits and install GFCI protection where we replace outlets.

  • 02

    Title 24 energy rules require new or altered kitchen lighting to be high-efficacy, which in practice means quality LED fixtures.

  • 03

    Removing or opening a load-bearing wall requires structural engineering and a permit, which is why our kitchens work within the existing walls.

  • 04

    We keep our projects within the scope that does not require a building permit, and we tell you at the first visit if what you have in mind would need one, so you can plan with no surprises.

  • 05

    If you live in an HOA community, check its rules on work hours, dumpsters and contractor parking before the start date.

  • Not sure what applies?

    We tell you at the free consultation whether your project fits within the scope that needs no permit.

    (844) FOR-LGCY
Selections

Materials & Options

Countertops

4 options

Quartz

Best for

Busy family kitchens

Non-porous and low maintenance, with consistent color. Use trivets: the resin can scorch under very hot pans.

Granite

Best for

Heavy cooking, natural look

Very heat resistant, and every slab is unique. Needs periodic sealing.

Marble (e.g. Calacatta)

Best for

Statement islands, bakers

Unmatched veining and a cool surface for pastry. Softer, and acids like lemon or wine can etch it.

Porcelain slab

Best for

Modern looks, sunny rooms

Thin, heat and UV resistant, and stain proof. Edges can chip under a hard impact.

Cabinets

3 options

Refacing

Best for

Sound boxes, tight budget

New doors, drawer fronts and veneer on existing boxes. The layout stays the same.

Semi-custom

Best for

Most full remodels

Wide choice of sizes, finishes and organizers, with moderate lead times.

Full custom

Best for

Unusual spaces, high-end design

Built to the inch in any species or finish. Longest lead time and highest cost.

"We had been looking to remodel our kitchen for a long time. And after a bad experience with a sloppy handyman, we found Legacy Construction through porch.com. Richard and his team did a great job of transforming our kitchen. Their professionalism and keen attention to details was impressive."
Katherine C.
Corona, CA

Kitchen Remodel FAQ

How much does a kitchen remodel cost in Southern California?

+
A full kitchen remodel in Southern California typically ranges from $35,000 to $75,000+. Semi-custom packages sit toward the lower end, while full custom cabinetry, natural stone and pro-grade appliances push a project past $75,000. Legacy provides a detailed written estimate after a free in-home consultation, so there are no surprises.

How long does a complete kitchen renovation take?

+
Most complete kitchen remodels take 3 to 4 weeks of on-site work, from demolition to completion. Before that, allow 1 to 2 weeks for design and 2 to 6 weeks for cabinets and materials to arrive. Timelines vary with project complexity, custom cabinetry lead times and material availability.

Do I need a permit for a kitchen remodel in Murrieta, Temecula or Corona?

+
You need a building permit when the remodel adds or moves plumbing, gas or electrical circuits, or changes walls. Cosmetic work such as new countertops or painted cabinets often does not need one, but each city sets its own rules. Legacy keeps its projects within the scope that does not need a permit, and we tell you at the first visit if your plans would require one.

Can I stay in my home during a kitchen remodel?

+
Yes. Most homeowners stay home during a kitchen remodel. We seal off the work area, protect your floors, and can help you set up a temporary kitchen with a microwave, refrigerator and a nearby sink.

What countertop materials do you recommend?

+
We work with quartz, granite, marble, porcelain and butcher block. Quartz is the most popular low-maintenance choice for busy families, granite handles heat best, and marble gives the most dramatic look but needs more care. Our design team helps you choose based on how you cook and your budget.

Can you remove a wall to open my kitchen to the living room?

+
Removing a wall requires structural engineering and a building permit, which puts it outside the projects we take on. Within the existing walls there is still a lot of room to open a kitchen up: an island or peninsula, a wider pass-through, lighter cabinetry, better lighting and a continuous floor all make the space feel larger. We walk through those options at the consultation.

How much space do I need for a kitchen island?

+
Plan for about 42 inches of walkway around an island for one cook, and about 48 inches if two people cook at once. Smaller kitchens can often fit a narrower island or a peninsula instead. We lay out clearances in the design so the kitchen works day to day.

Should I choose appliances before cabinets?

+
Yes. Appliance sizes, especially the range, refrigerator and any built-in or panel-ready units, set the cabinet layout. Choosing appliances early avoids costly changes once cabinets are ordered.

How much contingency should I budget for a kitchen remodel?

+
Setting aside 10 to 15 percent of the project cost covers most surprises, such as old pipes, past water damage or worn outlets and switches. If we find something during demolition, we show you, explain the options and price the work before doing anything.

Do you handle the plumbing and electrical work?

+
Yes. Plumbing and electrical work in the existing locations is part of our kitchen remodels and is done to current code. You do not need to hire or coordinate separate trades.

Do you provide design help and 3D renderings?

+
Yes. We create layout plans and 3D renderings so you can see your new kitchen before work begins, and we guide you through cabinet, countertop, tile, fixture and lighting selections.

Which cities do you serve for kitchen remodeling?

+
We remodel kitchens in Murrieta, Temecula, Wildomar, Corona, Eastvale, Chino, Chino Hills, Yorba Linda, Anaheim Hills, Anaheim, Brea, Fullerton and Orange, along with nearby communities in Riverside and Orange County.

Plan the Transformation

Every exceptional space begins with a conversation. Share your vision with us — we'll bring three decades of mastery to make it real.

"The attention to details and my personal preferences were addressed with professionalism plus patience… My kitchen is gorgeous! The plumbing, painting, new cabinetry, appliances, flooring, lighting, and design are impeccable!"
Kelly S. · Google Review
Call (844) FOR-LGCY

Mon–Fri 7:00 AM – 6:00 PM · Sat by appointment

Get Your Kitchen Remodel Estimate

Tell us a little about your project. We respond within 24 hours.