Bathroom Remodels
Bathroom Remodels

Luxury Bathroom Remodeling in Southern California

Create your personal sanctuary with Legacy Construction & Design. Our luxury bathroom renovations feature spa-inspired designs, custom tile work, freestanding soaking tubs, frameless glass shower enclosures, and premium fixtures.

Typical cost
$15,000–$50,000+
On-site time
8–12 days; primary suites 2–4 weeks
Permit
Not needed for the projects we take on
Serving
Riverside & Orange County

Bathroom Remodel Guide

By Legacy Construction & Design · CA License #790442 · Updated October 2026

A bathroom remodel in Southern California typically costs $15,000 to $50,000+, and on-site work usually takes 8 to 12 days for a standard bathroom or 2 to 4 weeks for a primary (master) suite. A hall bath refresh sits at the lower end; a larger walk-in shower with a bench and niches, heated floors, or natural stone and frameless glass throughout push a project toward the top of that range. Every project keeps the existing layout.

Legacy Construction & Design has remodeled bathrooms across Murrieta, Temecula, Corona and Orange County for over 35 years, including many tub-to-shower conversions. One team handles demolition, plumbing and electrical in the existing locations, waterproofing, tile, vanities, glass and finish work, so you have one point of contact from the first measurement to the final walkthrough. This guide covers what drives the cost, how the schedule works, what the code requires, and how to choose tile and shower enclosures.

What We Deliver

Freestanding soaking tubs
Frameless glass shower enclosures
Custom tile & stone work
Floating vanities with vessel sinks
Heated flooring systems
Premium brass & chrome fixtures
Custom lighting design
Waterproof niche & bench installations

Recent Projects

Bathroom Remodels project 1
Bathroom Remodels project 2
Bathroom Remodels project 3
Bathroom Remodels project 4
Bathroom Remodels project 5
Bathroom Remodels project 6

Before & After

Drag the slider to reveal the transformation.

Tub to Shower Conversion

Tub to Shower Conversion - afterTub to Shower Conversion - before
Before
After

Bathroom Remodel

Bathroom Remodel - afterBathroom Remodel - before
Before
After
Investment

Bathroom Remodel Cost in Southern California

Every bathroom is priced from a written estimate after a free in-home consultation. This is the typical range we see for homes in Riverside and Orange County.

Typical cost
$15,000–$50,000+

Where your project lands in this range depends on your space, the scope of work and the materials you choose.

What Moves the Price

01

Working within the layout

Our remodels keep the toilet, shower drain and vanity where they are, which keeps the project within the scope that does not need a permit. Moving a drain on a slab is permit work, so the layout stays and the finishes change.

02

Shower size and design

A larger shower within the existing footprint, a built-in bench, multiple niches or a handheld shower on a slide bar all add tile labor and waterproofing. A curbless entry needs the floor recessed, which requires a permit and is outside the projects we take on.

03

Tile choice and layout

Standard porcelain is the most cost-effective. Natural stone, small mosaics, large-format slabs and patterns such as herringbone take more material and more labor to install.

04

Glass enclosure

Frameless glass costs more than framed or sliding doors because it uses thicker glass and is custom measured and fabricated for your opening.

05

Vanity and fixtures

Stock vanities, semi-custom or custom cabinetry, and fixture finishes such as brushed brass or matte black can differ by thousands of dollars.

06

What's behind the walls

Past leaks, rotted subfloor or old galvanized pipe are only visible after demolition. We show you what we find and price it before any extra work.

How it unfolds

Bathroom Remodel Timeline

Most of the waiting happens before demolition, while tile, the vanity and fixtures are ordered. Once we start on site, a standard bathroom typically takes 8 to 12 days and a primary suite 2 to 4 weeks.

  1. 01

    Consultation & measure

    Week 0

    Free in-home visit to walk the space, talk through how you use the bathroom, and set a working budget.

  2. 02

    Design & selections

    1–2 weeks

    Layout options and selections for tile, vanity, countertop, fixtures, glass and lighting.

  3. 03

    Ordering

    1–4 weeks

    Lead times for vanities, tile and fixtures vary by supplier. We confirm delivery dates before we schedule demolition.

  4. 04

    Demolition & prep

    On-site days 1–3

    Protection of floors and hallways, demolition, then plumbing and electrical prep at the existing locations.

  5. 05

    Waterproofing & tile

    On-site days 3–9

    Backer board, shower pan and waterproofing membrane, a water test of the pan, then wall and floor tile and grout.

  6. 06

    Finish & walkthrough

    On-site days 9–12

    Vanity, countertop, toilet, fixtures, lighting, paint and accessories, final cleanup, and a walkthrough with you. Frameless glass is measured after tile and installed once it is fabricated.

Good to know

Permits & Code

In California, a bathroom remodel that adds or moves plumbing, adds electrical circuits, or changes walls needs a building permit from your city (for example Murrieta, Temecula or Corona) or from the county in unincorporated areas. Cosmetic work such as a new vanity in the same spot, a mirror or paint often does not, but rules vary by city.

  • 01

    Bathroom outlets must have GFCI protection, and the electrical code calls for a 20-amp circuit to serve bathroom receptacles. Adding a new circuit requires a permit and is outside the projects we take on, so we work with the existing circuit and install GFCI protection where we replace outlets.

  • 02

    Bathrooms with a shower or tub need an exhaust fan vented to the outside. California's green building code calls for ENERGY STAR fans with humidity control, and many cities apply that rule to remodels.

  • 03

    Shower valves must be pressure-balancing or thermostatic to prevent scalding. In homes built before 1994, a permitted remodel usually requires replacing older toilets, faucets and showerheads with water-conserving models.

  • 04

    We keep our projects within the scope that does not require a building permit, and we tell you at the first visit if what you have in mind would need one, so you can plan with no surprises.

  • 05

    If you live in an HOA community, check its rules on work hours, dumpsters and contractor parking before the start date.

  • Not sure what applies?

    We tell you at the free consultation whether your project fits within the scope that needs no permit.

    (844) FOR-LGCY
Selections

Materials & Options

Shower & floor tile

4 options

Porcelain

Best for

Most showers and floors

Dense, water resistant and low maintenance, with looks that mimic stone or wood. Harder to cut, so complex layouts take more labor.

Natural stone (marble, travertine)

Best for

Primary suites, classic looks

Every piece is unique. Needs periodic sealing, and acidic cleaners can etch it.

Large-format porcelain

Best for

Modern showers, fewer grout lines

Big panels mean less grout to clean. Requires very flat walls and floors and careful handling, which adds labor.

Mosaic

Best for

Shower floors, accent niches

Small tiles follow the slope of a shower floor and the extra grout lines add grip. More grout to keep clean.

Shower enclosures

4 options

Frameless glass

Best for

Open, modern walk-in showers

Thick glass with minimal hardware that shows off the tile and is easy to wipe down. Highest cost, and it is custom measured after tile is finished.

Semi-frameless

Best for

Clean look at a lower cost

Metal frame around the perimeter only, with a frameless-style door. Costs less than fully frameless.

Framed or sliding doors

Best for

Tub-showers, tight budgets

Lowest cost and good at keeping water in. The tracks and frames need more cleaning.

Fixed glass panel

Best for

Larger walk-in showers

No door to open or maintain. Needs enough shower depth and a well-placed drain to keep water off the bathroom floor.

"Richard and his crew at Legacy Construction & Design have done extensive work for me in both my home and apartments. The work has included kitchen/bath remodeling, baseboards, flooring, painting and so much more. They are so efficient and quick which is really great, he also always goes over everything twice ensuring quality work."
Sherry W.
Anaheim Hills, CA

Bathroom Remodel FAQ

How much does a bathroom remodel cost in Southern California?

+
Bathroom remodels in Southern California typically range from $15,000 to $50,000+, depending on size, materials and scope. A hall bath refresh that keeps the layout sits toward the lower end, while primary suites with natural stone, heated floors and premium fixtures reach the top of the range. Legacy provides a detailed written estimate after a free in-home consultation, so there are no surprises.

How long does a bathroom renovation take?

+
Most bathroom remodels take 8 to 12 days of on-site work for a standard bathroom and 2 to 4 weeks for a primary (master) suite. Before that, allow 1 to 2 weeks for design and time for tile, vanity and fixtures to arrive. We provide a detailed schedule before work begins.

Do I need a permit for a bathroom remodel in Murrieta, Temecula or Corona?

+
You need a building permit when the remodel moves or adds plumbing, adds electrical circuits, or changes walls. Cosmetic work such as a new vanity in the same location or paint often does not, but each city sets its own rules. Legacy keeps its projects within the scope that does not need a permit, and we tell you at the first visit if your plans would require one.

Can you convert a bathtub to a walk-in shower?

+
Yes. Tub-to-shower conversions are one of our most popular services. We remove the tub, update the drain at its existing location and the valve, build a waterproofed shower pan, and finish with custom tile, built-in niches and frameless glass. A conversion usually fits within the standard 8 to 12 day schedule.

Can I use my bathroom during the remodel if it's my only one?

+
Not for most of the project. The shower is out of use from demolition until the tile and glass are done, and the toilet is disconnected for part of the work. Many homeowners with a single bathroom plan to shower at a gym or with family, and we walk through the schedule with you ahead of time so you know which days the toilet is offline.

Do you install heated bathroom floors?

+
Yes, when the mat can run on an existing GFCI-protected circuit. We install electric radiant heating mats under tile, controlled by a programmable thermostat so the floor is warm when you need it. A mat that needs its own new circuit requires a permit and is outside the projects we take on, so we check the existing circuit at the consultation before planning a heated floor.

What tile materials work best for bathrooms?

+
Porcelain is the best all-around choice for showers and floors because it is dense, water resistant and low maintenance. Natural stone such as marble and travertine adds character but needs periodic sealing. Our design team helps you choose tile that balances looks with how much upkeep you want.

Can I get a curbless shower?

+
Not a true curbless shower. A curbless shower needs the shower floor set lower than the bathroom floor, which means cutting a concrete slab or reframing a raised floor. That work requires a permit and is outside the projects we take on. The in-scope alternative is a low-threshold walk-in shower at the existing drain, with a low curb that is easy to step over and frameless glass that keeps the open look.

How do you waterproof a shower?

+
Every shower gets a sloped shower pan and a waterproofing membrane behind the tile, not just tile and grout. The pan is water tested before any tile goes in. Proper waterproofing is what protects the framing and subfloor from leaks over time.

How much contingency should I budget for a bathroom remodel?

+
Setting aside 10 to 15 percent of the project cost covers most surprises, such as past leaks, rotted subfloor or old pipes. If we find something during demolition, we show you, explain the options and price the work before doing anything.

Do you handle the plumbing and electrical work?

+
Yes. Plumbing and electrical work in the existing locations is part of our bathroom remodels and is done to current code. You do not need to hire or coordinate separate trades.

Which cities do you serve for bathroom remodeling?

+
We remodel bathrooms in Murrieta, Temecula, Wildomar, Corona, Eastvale, Chino, Chino Hills, Yorba Linda, Anaheim Hills, Anaheim, Brea, Fullerton and Orange, along with nearby communities in Riverside, San Bernardino and Orange County.

Plan the Transformation

Every exceptional space begins with a conversation. Share your vision with us — we'll bring three decades of mastery to make it real.

"Great job from Richard Centella from Legacy Construction and Design - he and his crew did an excellent job converting two of our bathtubs into walking showers. He was present every workday making sure that things were running smoothly and on schedule. The job was completed on time and to our complete satisfaction."
Maria O. · Google Review
Call (844) FOR-LGCY

Mon–Fri 7:00 AM – 6:00 PM · Sat by appointment

Get Your Bathroom Remodel Estimate

Tell us a little about your project. We respond within 24 hours.

  • CA License #790442
  • BBB Accredited A+
  • 35+ Years
  • Free In-Home Consultation

No obligation. Your information is kept confidential.