Living Room & Office Space Remodeling in Southern California
Reimagine your living and working spaces with Legacy Construction & Design. We create custom built-ins, refined finishes, intelligent layouts, and premium flooring solutions that transform ordinary rooms into extraordinary spaces.
- Typical cost
- $10,000–$40,000+
- On-site time
- 2–4 weeks
- Permit
- Not needed for the projects we take on
- Serving
- Riverside & Orange County
Living Room & Office Remodel Guide
By Legacy Construction & Design · CA License #790442 · Updated October 2026
A living room or home office remodel in Southern California typically costs $10,000 to $40,000+, and on-site work usually takes 2 to 4 weeks once materials and any custom built-ins are ready. New flooring, trim, paint and lighting sit at the lower end; a built-in media wall or office, a full lighting plan, a new fireplace surround and built-ins on more than one wall push a project toward the top of that range and beyond.
Legacy Construction & Design has remodeled living rooms, dens and home offices across Murrieta, Temecula, Corona and Orange County for over 35 years. One team handles design, demolition, electrical work on the existing circuits, flooring, built-in cabinetry, trim and paint, so you have one point of contact from the first measurement to the final walkthrough. This guide covers what drives the cost, how the schedule really works, what the code requires, and how to choose flooring and built-in finishes.
What We Deliver
Recent Projects






Before & After
Drag the slider to reveal the transformation.
Office Space Remodel


Living Room Remodel


Living Room & Office Remodel Cost in Southern California
Every living room and office remodel is priced from a written estimate after a free in-home consultation. This is the typical range we see for homes in Riverside and Orange County.
Where your project lands in this range depends on your space, the scope of work and the materials you choose.
What Moves the Price
Custom built-ins
Often the largest single line item. Cost follows linear footage, door and drawer count, and whether the finish is paint-grade or stain-grade.
Flooring material and area
LVP costs less per square foot than engineered or solid hardwood. Running new flooring through hallways and adjoining rooms adds area but avoids awkward transitions.
Electrical and lighting
Swapping fixtures in place is modest. Adding recessed lights on an existing circuit or setting up a TV and AV location means low-voltage wiring and patching. A new dedicated circuit for office equipment requires a permit and is outside the projects we take on.
Working within the layout
Our remodels keep the walls where they are, which keeps the project within the scope that does not need a permit. Built-ins, lighting and finishes do the work of changing how the room feels.
Fireplace surround
A new surround and mantel on an existing fireplace is finish work: stone, tile or a built-up wood mantel. Changing the firebox, gas or venting is permit work we do not take on.
What's under the floor and behind the walls
Uneven slabs, old adhesive, or outdated wiring are only visible once work starts. We show you what we find and price it before any extra work.
Living Room & Office Remodel Timeline
Custom built-ins are made before we install them, so most of the waiting happens before work starts in your home. Once we start on site, a living room or home office typically takes 2 to 4 weeks.
Start with a free consultation- 01
Consultation & measure
Week 0Free in-home visit to walk the room, talk through how you relax, work or entertain, and set a working budget.
- 02
Design & selections
1–2 weeksLayout and built-in drawings, plus selections for flooring, trim profiles, finishes, lighting and hardware.
- 03
Built-in fabrication & ordering
2–6 weeksCustom built-ins are made to your measurements while flooring and fixtures are ordered. We confirm delivery dates before we schedule the work.
- 04
Protection, demolition & prep
On-site week 1Floors and furniture protected, dust barriers up, old flooring and trim removed, and lighting and low-voltage prep on the existing circuits.
- 05
Flooring & built-in installation
On-site weeks 1–3Subfloor preparation and flooring, then built-in installation, fireplace surround, crown molding, wainscoting and trim.
- 06
Finish & walkthrough
On-site weeks 2–4Paint, lighting and dimmers, hardware, and a walkthrough of every detail with you.
Permits & Code
In California, a living room or office remodel that moves walls or changes a gas fireplace needs a building permit from your city (for example Murrieta, Temecula or Corona) or from the county in unincorporated areas. Cosmetic work such as new flooring, paint, trim or wainscoting usually does not, but rules vary by city.
- 01
Replacing flooring, painting, installing trim and swapping a light fixture in the same location are usually permit-free. Moving or removing walls and changing a gas fireplace are not, which is why our projects stay within the existing layout.
- 02
California's electrical code requires arc-fault (AFCI) protection on new or extended circuits serving living rooms, family rooms, dens and bedrooms. New circuits require a permit and are outside the projects we take on, so office and media wall power comes from the existing circuits.
- 03
Title 24 energy rules require new or altered lighting to be high-efficacy, which in practice means quality LED fixtures, and most living-space lighting needs a dimmer or vacancy sensor.
- 04
A new fireplace surround and mantel on an existing fireplace is finish work. Changing the firebox, gas line or venting is permit work, so we leave the fireplace itself as it is and refinish around it.
- 05
We keep our projects within the scope that does not require a building permit, and we tell you at the first visit if what you have in mind would need one, so you can plan with no surprises.
- (844) FOR-LGCYNot sure what applies?
We tell you at the free consultation whether your project fits within the scope that needs no permit.
Materials & Options
Flooring
4 optionsEngineered hardwood
Most living rooms and offices
Real wood on a stable plywood core, so it handles slabs and seasonal humidity well. Can be refinished only a limited number of times, depending on wear-layer thickness.
Solid hardwood
Long-term homes, wood subfloors
Can be sanded and refinished many times over its life. Moves with humidity and is not a good fit directly over a concrete slab.
Luxury vinyl plank (LVP)
Kids, pets, high traffic
Water resistant, quiet underfoot with a good pad, and cost effective. Cannot be refinished, and heavy furniture or sharp impacts can dent it.
Porcelain tile or natural stone
Hard-wearing, cool floors
Very durable and easy to clean. Harder and colder underfoot, louder in open rooms, and natural stone needs periodic sealing.
Built-in finishes
3 optionsPaint-grade MDF
Painted built-ins, shaker doors
Smooth, stable surface that holds paint well and will not show grain. Heavy and does not tolerate water, so it is kept away from wet areas.
Stain-grade hardwood
Libraries, traditional offices
Solid oak, walnut or maple shows real grain and ages well. Costs more and moves slightly with humidity, which the joinery has to allow for.
Veneer plywood
Wide shelves, modern media walls
Real wood veneer over a strong, stable core that holds screws and resists sagging. Exposed edges need banding, and deep scratches cannot be sanded out like solid wood.
"Richard proved to be very responsive, providing several options at a reasonable price. His group was able to handle the demo, install high quality wood flooring, and complete the project in a timely manner. I would definitely use Legacy Construction again."
Living Room & Office Remodel FAQ
How much does a living room remodel cost in Southern California?
+
How long does a living room or home office remodel take?
+
Do I need a permit for a living room or office remodel in Murrieta, Temecula or Corona?
+
Can you build a home office into an existing room?
+
Can you convert a spare bedroom or loft into a home office?
+
What flooring do you recommend for living rooms?
+
Do you handle electrical work for home offices?
+
Can you wire a media wall for a TV and sound system?
+
Can you soundproof a home office?
+
Do I need to move my furniture out, and can I stay home?
+
How do you control dust during a remodel?
+
Which cities do you serve for living room and office remodeling?
+
Plan the Transformation
Every exceptional space begins with a conversation. Share your vision with us — we'll bring three decades of mastery to make it real.
"Richard and his crew worked on a custom, one-of-a-kind, office remodeling project in my house. This was a challenging project with complex light railing designs, floating shelves throughout, etc. Richard and team did a great job and the result was impressive. Richard and his crew were patient, confirmed every detail with me throughout the remodeling, and always did everything I asked even though I requested quite a few changes and additions throughout the project."